All Case HistoriesALUCOBOND® naturAL MEETS UNIQUE DESIGN TWIST AT SUSTAINABLE 2010 WINTER OLYMPIC VILLAGE02-08-112,449 Views Three architectural firms were challenged by the Vancouver Organizing Committee to design Millennium Water: The Southeast False Creek Olympic Village in Vancouver, British Columbia, Canada, for its first use as a temporary home for many of the 2,600 athletes from 82 nations competing in the 2010 Winter Olympics. more NASCAR TROPHY DISPLAY RACES TO FINISH LINE WITH ALUCOBOND® ACM01-04-113,190 Views ScottModels has fabricated two 12-foot tall replicas of the Tiffany & Co.-designed 24-inch tall silver trophy awarded to Johnson as the series winner. more Seven Clans Casino Red Lake06-25-102,287 Views Architectural design of the newly opened Seven Clans Casinos Red Lake followed the wishes of community elders of the Red Lake Band of Chippewa Indians who own and operate this casino-hotel complex located in north-central Minnesota on the reservation’s southern edge. They wanted the facility’s design to respect tribal heritage but also to exude an atmosphere of fun and relaxation. more Mission Hospital Patient Care Tower04-26-101,234 Views “We chose Alucobond for cladding because of its flexibility, durability and high quality,” said Sylvia Botero, AIA, LEED AP, senior vice president, RBB Architects. “Alucobond imposes very few design limitations; and, this project featured any number of cylindrical and radial shapes. Alucobond allowed for these sculpted forms. It gave us freedom of design. And, because the hospital is located within four miles of the Pacific Ocean, we needed a corrosion-resistant panel. We’ve used Alucobond panels on other projects and know they perform well.” more Minnetonka Schools03-09-101,317 Views The Minnetonka, Minn., High School is considered the flagship of Minnetonka Public School District #276, which serves approximately 8,400 students in grades K-12 in this suburban community located just eight miles west of Minneapolis in Hennepin County. As such, it was the first among the district’s schools to receive a facelift completed in January 2009 that included a secure entry and office space within a two-story beacon-like rotunda. more
|
CASE HISTORIESBy Category:Green Buildings (9)Airports/Transportation (4) Office Buildings (7) Public Venues/Convention Centers (14) Hospitals (9) Hotels (6) Government Buildings (7) Educational Facilities (10) Residential Buildings (6) Corporate ID (CID) (17) Signage (13) Interior Applications (6) Retrofit (1) |