{"id":680,"date":"2005-09-27T18:38:22","date_gmt":"2005-09-27T18:38:22","guid":{"rendered":"http:\/\/www.alucobondusa.com\/blog\/?p=680"},"modified":"2025-09-05T14:22:18","modified_gmt":"2025-09-05T14:22:18","slug":"uc-riverside","status":"publish","type":"post","link":"https:\/\/www.alucobondusa.com\/blog\/uc-riverside\/","title":{"rendered":"UC Riverside"},"content":{"rendered":"<p><a href=\"https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-681\" src=\"https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_1.jpg\" alt=\"Alucobond, UC Riverside, Elward Systems Corporation, Riverside, California\" width=\"1200\" height=\"798\" srcset=\"https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_1.jpg 1200w, https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_1-300x199.jpg 300w, https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_1-1024x680.jpg 1024w, https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_1-670x445.jpg 670w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><\/p>\n<table border=\"1\" width=\"100%\" cellpadding=\"10\">\n<tbody>\n<tr>\n<th>Project Name:<\/th>\n<td>UC Riverside<\/td>\n<\/tr>\n<tr>\n<th>Project Location:<\/th>\n<td>Riverside, California<\/td>\n<\/tr>\n<tr>\n<th>ALUCOBOND\u00ae PLUS Materials:<\/th>\n<td>36,000 sq. ft. of 4mm Silver Metallic<\/td>\n<\/tr>\n<tr>\n<th>Year of Installation:<\/th>\n<td>2005<\/td>\n<\/tr>\n<tr>\n<th>Architect:<\/th>\n<td>RBB Architects Inc., Los Angeles, CA<\/td>\n<\/tr>\n<tr>\n<th>Fabricator:<\/th>\n<td>Elward Systems Corporation, Lakewood, Colorado<\/td>\n<\/tr>\n<tr>\n<th>Installer:<\/th>\n<td>Engineered Metals Co., Fair Oaks, Texas<\/td>\n<\/tr>\n<tr>\n<th>Attachment Method:<\/th>\n<td>Rout and return dry system<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>ALUCOBOND\u00ae Material Courtyard Adds &#8220;High-Tech&#8221; Look<\/p>\n<p>How do you introduce the \u201chigh-tech\u201d look of metal as part of an engineering building on a university campus where brick makes a traditional statement? A suggestion of metal in the context of a brick exterior leads to a courtyard where the walls are clad predominantly in ALUCOBOND\u00ae Material\u2014at the University of California, Riverside, Engineering Building Unit 2. Also introduced as a complement to brick on the exterior, sandstone is utilized as part of the courtyard as well. Overhead, the courtyard canopy of PVC fabric becomes an innovative design element that mixes well with the high-tech look of ALUCOBOND\u00ae Material cladding.<!--more--><\/p>\n<p><a href=\"https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-683\" src=\"https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_3.jpg\" alt=\"Alucobond, UC Riverside, Elward Systems Corporation, Riverside, California\" width=\"650\" height=\"978\" srcset=\"https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_3.jpg 650w, https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_3-199x300.jpg 199w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><\/a><\/p>\n<p>Completed in mid-2005, the project required approximately 36,000 sq. ft. of 4mm ALUCOBOND\u00ae Material in Silver Metallic, fabricated by Elward Systems Corporation of Lakewood, Colorado. ALUCOBOND\u00ae Material panels were attached by a rout and return dry system, featuring black extrusions. Installation was provided by Engineered Metals Co. of Fair Oaks, Texas. General contractor for the project was Swinerton, headquartered in San Francisco.<\/p>\n<p>The new, 4-story facility was planned in response to a growing number of students at the campus majoring in engineering and an increasing number of new faculty at UC Riverside\u2019s Bourns College of Engineering. The building includes state-of-the-art research and teaching space for the Computer Science and Engineering, as well as Electrical Engineering departments.<\/p>\n<p><a href=\"https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-682\" src=\"https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_2.jpg\" alt=\"Alucobond, UC Riverside, Elward Systems Corporation, Riverside, California\" width=\"650\" height=\"978\" srcset=\"https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_2.jpg 650w, https:\/\/cdn.alucobond.3acompositesusa.com\/2014\/01\/Alucobond_UC_Riverside_Elward_Systems_Corporation_Riverside_California_2-199x300.jpg 199w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/><\/a><\/p>\n<p>The project involved extensive detail, according to RBB Architects Inc., Los Angeles. Established in 1952, RBB Architects has become a leader in the programming, planning and design of complex institutional facilities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Name: UC Riverside Project Location: Riverside, California ALUCOBOND\u00ae PLUS Materials: 36,000 sq. ft. of 4mm Silver Metallic Year of Installation: 2005 Architect: RBB Architects Inc., Los Angeles, CA Fabricator: Elward Systems Corporation, Lakewood, Colorado Installer: Engineered Metals Co., Fair Oaks, Texas Attachment Method: Rout and return dry system ALUCOBOND\u00ae Material Courtyard Adds &#8220;High-Tech&#8221; Look [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_s2mail":"yes","footnotes":""},"categories":[3],"tags":[11,39,61,37,38,28,29,41,40],"class_list":["post-680","post","type-post","status-publish","format-standard","hentry","category-case-studies","tag-acm","tag-acp","tag-airport","tag-aluminum-composite-material","tag-aluminum-composite-panel","tag-architecture","tag-design","tag-educational","tag-exteriors"],"_links":{"self":[{"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/posts\/680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/comments?post=680"}],"version-history":[{"count":4,"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/posts\/680\/revisions"}],"predecessor-version":[{"id":7450,"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/posts\/680\/revisions\/7450"}],"wp:attachment":[{"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/media?parent=680"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/categories?post=680"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.alucobondusa.com\/blog\/wp-json\/wp\/v2\/tags?post=680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}