ALUCOBOND Blog | 2009

All Categories Awards Case Studies Company News Hospitals In the Press Let's Talk Tech

Minnetonka Schools

Project Name: Minnetonka Schools
Project Location: Minnetonka, Minnesota
Alucobond Materials: 5,359 sq ft of 4mm custom Arabian Blue
4,385 sq ft of 4mm Platinum Mica
Attachment Method: Rout and Return Wet Seal
Year of Installation: 2009
Architect: ATS&R Planners/Architects/Engineers, Minneapolis
Fabricator/Installer: Innovative Building Concepts, Inc.Bloomington, Minn.
General Contractor: Merrimac Construction Co., Inc.Bethel, Minn.

SCHOOLS’ NEW WELCOMING, SECURE ENTRYWAYS FINISHED WITH ALUCOBOND® ACM

The Minnetonka, Minn., High School is considered the flagship of Minnetonka Public School District #276, which serves approximately 8,400 students in grades K-12 in this suburban community located just eight miles west of Minneapolis in Hennepin County.  As such, it was the first among the district’s schools to receive a facelift completed in January 2009 that included a secure entry and office space within a two-story beacon-like rotunda.