All Categories Awards Case Studies Company News Corporate ID (CID) Educational Facilities From the Experts Guest Blogs
Hospitals In the Press Let's Talk Tech Office Buildings Pre-fab Prefabrication Public Venues/Convention Centers Uncategorized

Stony Brook University Residence Halls, Student Center Focused On Future With Modern ALUCOBOND PLUS Cladding

Project Name: Stony Brook University Residence Halls
Project Location: Stony Brook, New York
ALUCOBOND® Materials: 100,000 sq. ft., 4mm ALUCOBOND® PLUS
Custom Birch, Flag Red, SUNY Orange, Bone White, Custom Arabian Blue, Cadet Gray
Year of Installation: 2010
Architect: Goshow Architects of New York
Fabricator/Installer: Kenneth J. Herman, Inc., Amityville, N.Y.
General Contractor: J. Kokolakis Contracting Inc., Bohemia, N.Y.
Images: Taylor Crothers Photography

As part of The State University of New York (SUNY), Stony Brook University on Long Island’s north shore, is part of the nation’s largest and most comprehensive state university system, which web site states “ is committed to providing quality education at an affordable price.”  So, when new residence halls recently were required to meet the needs of Stony Brook’s fast-growing student population, both budget and time constraints played important roles in the buildings’ architectural design.

Minnetonka Schools

Project Name: Minnetonka Schools
Project Location: Minnetonka, Minnesota
ALUCOBOND® Materials: 5,359 sq ft of 4mm custom Arabian Blue
4,385 sq ft of 4mm Platinum Mica
Attachment Method: Rout and Return Wet Seal
Year of Installation: 2009
Architect: ATS&R Planners/Architects/Engineers, Minneapolis
Fabricator/Installer: Innovative Building Concepts, Inc.Bloomington, Minn.
General Contractor: Merrimac Construction Co., Inc.Bethel, Minn.

SCHOOLS’ NEW WELCOMING, SECURE ENTRYWAYS FINISHED WITH ALUCOBOND® ACM

The Minnetonka, Minn., High School is considered the flagship of Minnetonka Public School District #276, which serves approximately 8,400 students in grades K-12 in this suburban community located just eight miles west of Minneapolis in Hennepin County.  As such, it was the first among the district’s schools to receive a facelift completed in January 2009 that included a secure entry and office space within a two-story beacon-like rotunda.

Warren, MI Civic Center

Project Name: Warren, MI Civic Center
Project Location: Warren, Michigan
ALUCOBOND® PLUS Materials: 23,240 sq. ft. 4mm Custom LCH Silver
Year of Installation: 2006
Fabricator: Sobotec Ltd., Hamilton, Ontario, Canada
Installer: Michigan Metal Walls, Inc., Wyandotte, MI
General Contractor: Skanska USA Building, Inc., Southfield, MI
Attachment Method: SL2000 Dry Rain Screen

New civic center features striking ALUCOBOND® canopy, helps give citizens place of identity

With the opening of the Warren Civic Center – housing the new city hall and library – in November 2006, a master plan for the City of Warren, Mich., first drafted in 1963 came to fruition. According to Aug, 24, 2004, news reports of the civic center groundbreaking ceremonies by the City of Warren Communications Department, the city’s mayor presented a copy of the Aug. 29, 1956, edition of the Warren Township Journal, with a headline announcing: “Approve plans for future city hall.”

Fluor Corporation Headquarters

Project Name: Fluor Corporation Headquarters
Project Location: Irving, Texas
ALUCOBOND® PLUS Materials: 10,000 sq. ft. of 4 mm Bone White
Year of Installation: 2006
Architect: Forum Studio, Inc., St. Louis
Fabricator: NOW Specialties, Inc., Carrollton, Texas
General Contractor/Installer: Clayco, Inc., St. Louis
Attachment Method: Stainless steel fasteners

ALUCOBOND® Louvers Let the Texas Sun Shine in Without Heavy Heat Load

When executives at engineering and construction giant Fluor Corp decided to build a new global corporate headquarters in Irving, Texas, last year, meeting a tight construction deadline was of the utmost importance. Design plans for the 140,000-square-foot, three-story, dual-wing corporate building were begun in mid-June 2005, with ground-breaking in late July. Just eight months later, construction was completed. Similar projects, according to Fluor, usually require a 16-month timeline to complete.

Family Eye & ENT Center

Project Name: Family Eye & ENT Center
Project Location: Willmar, Minnesota
ALUCOBOND® PLUS Materials: 15,200 sq. ft. 4mm Custom Blue,
5,600 sq.ft. 4mm Silver Metallic
Year of Installation: 2005
Architect: Eckert and Wordel, Kalamazoo, MI
Fabricator: Unlimited Image, Inc., Burnsville, MN
Installer: Specialty Systems, Inc., Burnsville, MN
Attachment Method: Rout and Return Wet Seal

Owners create regional focal point with contemporary building design

When the physician-owners of Family Eye Center first envisioned building a new regional center in Willmar, Minn., offering a total package of eye care services – from yearly eye examinations to LASIK and cataract surgery, treatment of eye diseases, fashion and budget eye ware, and contact lens fitting – they wanted the building’s architectural design to stand out.

Alaska Psychiatric Institute

Project Name: Alaska Psychiatric Institute
Project Location: Anchorage, Alaska
ALUCOBOND® PLUS
Materials:
9,917 sq. ft. of 4mm Silver Metallic
Year of Installation: 2005
Architect: Koonce Pfeffer Bettis, Inc., Anchorage
Fabricator: KPS, Vancouver, Canada
Installer: Bucher Glass, Fairbanks
Attachment Method: KPS rain-screen systems A and C
Images: Ken Graham Photography

ALUCOBOND® Material Crowns New Psychiatric Hospital

The new Alaska Psychiatric Institute (API) in Anchorage, which opened for patients in July of 2005, is a visually engaging symbol of sophisticated psychiatric treatment and architectural success.