ALUCOBOND Blog | green building | Page 2

All Categories Awards Case Studies Company News Hospitals In the Press Let's Talk Tech

Stony Brook University Residence Halls, Student Center Focused On Future With Modern ALUCOBOND PLUS Cladding

Project Name: Stony Brook University Residence Halls
Project Location: Stony Brook, New York
Alucobond Materials: 100,000 sq. ft., 4mm Alucobond Plus
Custom Birch, Flag Red, SUNY Orange, Bone White, Custom Arabian Blue, Cadet Gray
Year of Installation: 2010
Architect: Goshow Architects of New York
Fabricator/Installer: Kenneth J. Herman, Inc., Amityville, N.Y.
General Contractor: J. Kokolakis Contracting Inc., Bohemia, N.Y.
Images: Taylor Crothers Photography

As part of The State University of New York (SUNY), Stony Brook University on Long Island’s north shore, is part of the nation’s largest and most comprehensive state university system, which web site states “ is committed to providing quality education at an affordable price.”  So, when new residence halls recently were required to meet the needs of Stony Brook’s fast-growing student population, both budget and time constraints played important roles in the buildings’ architectural design.

NERCC, the Boston Carpenters Training Center and the Union’s Vision Center

Project Name: Boston Carpenters Training Center
Project Location: Boston, Massachusetts
Alucobond Materials: 10,500 sq ft 4mm Custom Copper Metallic
10,500 sq ft 4mm Carpenters Mica
22,000 sq ft 4mm Custom Pewter Creek
Year of Installation: 2010
Architect: ADD INC, Boston
Fabricator/Installer: Sunrise Erectors, Inc.
General Contractor: Suffolk Construction Co., Inc.
Images: Robert Umenhofer

The New England Council of Carpenters (NERCC) has represented the interests of its members for more than 130 years.  While a long-standing regional presence, this traditional organization based in Boston also embraces modern goals for its membership of 22,000 carpenters in six New England states.  So, when the new home of NERCC and the Boston Carpenters Training Center was designed, it was important to organization leaders that it be comprised of both traditional and modern architectural influences.

Alucobond NaturAL Meets Unique Design Twist At Sustainable 2010 Winter Olympic Village

Project Name: Southeast False Creek Olympic Village
Project Location: Vancouver, British Columbia, Canada
Alucobond Materials: 77,000 sq ft 4mm Alucobond naturAL Brushed
Year of Installation: 2009
Architect: Nick Milkovich Architects
Fabricator/Installer: Keith Panel Systems Co., Ltd.Vancouver, British Columbia, Canada
General Contractor: ITC Construction GroupVancouver, British Columbia, Canada
Images: Keith Panel Systems, Nick Milkovich Architects, Michael Elkan

Three architectural firms were challenged by the Vancouver Organizing Committee to design Millennium Water:  The Southeast False Creek Olympic Village in Vancouver, British Columbia, Canada, for its first use as a temporary home for many of the 2,600 athletes from 82 nations competing in the 2010 Winter Olympics. (The Olympic Games were held Feb. 12-28, 2010, in venues located throughout Greater Vancouver, as well as in the resort town of Whistler, British Columbia, where additional athletes were hosted.)  More permanently, Millennium Water was designed as a sustainable mixed-use residential and commercial community, incorporating not only environmental sustainability but social and economic sustainability goals as well.

Tempe, Ariz. Transportation Center

Project Name: Tempe, Arizona Transportation Center
Project Location: Tempe, Arizona
Alucobond Materials: 8,300 sq ft of4mm Spectra Green
7,700 sq ft of4mm Platinum
Year of Installation: 2008
Architect: Otak – Lake Oswego, Oregon
Architekton – Tempe, Arizona
Fabricator: Elward Systems Corp., Lakewood, Colo.
Installer: Elward Construction Co., Tempe, Arizona

Alucobond® Spectra ACM Helps Create Sparkling, Sustainable Gem at Tempe, Ariz. Transportation Center

City of Tempe, Ariz., architects and engineers are no strangers to sustainable building design. The $46.8 million East Valley Bus Operations & Maintenance Facility, which is owned and operated by the Arizona cities of Tempe and Scottsdale and Valley Metro, achieved two Leadership in Energy and Environmental Design (LEED) Gold certifications from the U.S. Green Building Council following its summer 2007 opening.

Fluor Corporation Headquarters

Project Name: Fluor Corporation Headquarters
Project Location: Irving, Texas
ALUCOBOND PLUS Materials: 10,000 sq. ft. of 4 mm Bone White
Year of Installation: 2006
Architect: Forum Studio, Inc., St. Louis
Fabricator: NOW Specialties, Inc., Carrollton, Texas
General Contractor/Installer: Clayco, Inc., St. Louis
Attachment Method: Stainless steel fasteners

Alucobond® Louvers Let the Texas Sun Shine in Without Heavy Heat Load

When executives at engineering and construction giant Fluor Corp decided to build a new global corporate headquarters in Irving, Texas, last year, meeting a tight construction deadline was of the utmost importance. Design plans for the 140,000-square-foot, three-story, dual-wing corporate building were begun in mid-June 2005, with ground-breaking in late July. Just eight months later, construction was completed. Similar projects, according to Fluor, usually require a 16-month timeline to complete.